Tatu City Integrated Infrastructure Development

Scope: Multidisciplinary Infrastructure Design, Construction, Supervision & Commissioning

Consultancy Fees: USD 2,926,430

Frame Consultants has played a central and sustained role in the planning, design, delivery, and supervision of integrated urban infrastructure for Tatu City, one of Kenya’s largest and most ambitious mixed-use developments. Our involvement spans multiple development phases and precincts, supporting the transformation of greenfield land into a fully serviced, master-planned city with industrial, commercial, residential, and logistics zones.

Across a series of interrelated consultancy and construction contracts, Frame Consultants delivered end-to-end engineering services covering roads, stormwater drainage, water supply and distribution, wastewater collection and conveyance, power infrastructure, street lighting, and ICT networks. This included trunk and precinct-level infrastructure works for key development areas such as Tatu Industrial Park Phases 1 and 2, Kijani precincts, Unity Blue, Kofinaf Road, and major city arterials and junction improvements.

Scroll to Top