GoK/UNICEF Programme
150 150 Frame Consultants Limited

Programme for Acceleration of Water Supply and Sanitation towards Reaching the Millennium Development Goals, through the GoK/UNICEF Programme of Cooperation 2004 – 2008 – Development of Project Implementation Manual (PIM).…

WSPs
150 150 Frame Consultants Limited

Identification of Water Service Providers that need to Apply for Tariff Reviews and Analysis of Capacity Constraints in the Process of Tariff Adjustments. The Ministry of Water and Irrigation (MWI)…

Kenya Water Sector Review 2008
150 150 Frame Consultants Limited

The objective of this assignment was to carry out an in-depth water sector review focusing on Kenya’s water sector performance, needs, challenges and objectives in the development of its water…

Nanyuki Water Supply Project (NAWASCO)
150 150 Frame Consultants Limited

Feasibility Study and Detailed Design of Nanyuki Water Supply Project The assignment’s purpose was to come up with design on measures to augment the supply of water within Nanyuki Municipality…

Kiambere-Mwingi Water Supply and Sanitation Project
150 150 Frame Consultants Limited

Feasibility Study for Rehabilitation and Augmentation of Kiambere-Mwingi Water Supply and Sanitation Project The objective of this assignment was to carry out desk study to appreciate the water sector issues…

WASREB
150 150 Frame Consultants Limited

Improvement on Performance Benchmarking Toolkit for Water Services Regulatory Board. The objective of the assignment was to review the existing performance assessment tools, identify the ones that need improvements and…

Kenyatta University
150 150 Frame Consultants Limited

Consultancy Services for the main Water Pipeline and Storage Reservoir to the Kenyatta University, Thika Road The scope of the study was to review the existing as built plans, provision…

Kenya’s Water Sector Strategic Plan (WSSP)
150 150 Frame Consultants Limited

Development of Social Dimension of Kenya’s Water Sector Strategic Plan (WSSP) 2009 – 2014 The overall objective of the assignment was to contribute high quality inputs to social dimensions in…

Mini Hydro Power Generation
150 150 Frame Consultants Limited

Consultancy Services for the Design of Mini Hydro Power Generation for Nanyuki Water and Sewerage Project This assignment involved designing the turbine, generator and controls boards, Step–up transformer (1No) &…

WaSSIP
150 150 Frame Consultants Limited

Services Board – Water & Sanitation Service Improvement Project (WaSSIP) The purpose of the assignment was to assist CWSB and the WSPs in updating and matching of customer meter account…