Consultancy Services for Design, Preparation of Procurement Documents and Supervision of Water Supply Projects in Three Counties of Busia, Kakamega and Migori
The scope of works for these projects in Busia, Kakamega and Migori Counties were broadly categorized as below:
- Extension and/or rehabilitation of transmission and distribution water mains to households, water kiosks and institutions;
- Rehabilitation of water supply system elements, (supply intakes, water treatment plants, water storage tanks, chemical dosing units,
- Mapping and metering of
The scope of the consultancy was as below:-
- Reconnaissance Survey, collection and analysis of general data;
Formulation of Design Criteria;
- Topographical Survey and Geotechnical Investigations;
- Mapping of connections and audit for rehabilitation works;
- Design of pipelines, dosing units and preparation of Detailed Design Report;
- Preparation of the Bills of Quantities and Confidential Engineers Cost Estimates;
- Preparation of Tender Documentation;
- Construction Supervision
(Completed December 2019)