Feasibility Study for Rehabilitation and Augmentation of Kiambere-Mwingi Water Supply and Sanitation Project
The objective of this assignment was to carry out desk study to appreciate the water sector issues in the board area, extensive survey to establish the viability of the project to serve entire Mwingi and Kyuso districts, Environmental Impact Assessment of the recommended options, prepared an EIA report in accordance with NEMA guidelines and prepared a draft TOR for the detailed study that included detailed designs of the proposed project components that will lead to the preparation of tender documents.
(Completed, June 2009)